CHAPTER 1 INTRODUCTION
Purpose
Scope
Reference
General system testing requirements
Component testing
System commissioning testing
Cost of commissioning
CHAPTER 2 GENERAL SYSTEM TESTING REQUIREMEN
Introduction
General test plan
Types of testing methods
Insulation testing
Switch/circuit breaker testing
Transformer testing
Rotating machine testing
Protective relays
Ground system testing
CHAPTER 3 COMPONENT TESTING
Introduction to component testing
Circuit switchers
Transformers
Switchgear – medium voltage
Switchgear – low voltage
Transfer switch
AC/DC drives
Motors
Generators
Batteries
Battery chargers
UPS systems
Cables
CHAPTER 4 MAIN POWER SYSTEM
Description of main power system
Operation of main power system
Commissioning plan for main power system
Installation inspections and component testing of main power system
Energizing and test of the main power system
Possible failures and corrective actions of the main power system
CHAPTER 5 STANDBY POWER SYSTEM
Description of standby power system
Operation of standby power system
Commissioning plan for standby power system
Installation inspections and component testing of standby power system
Energizing and test of the standby power system
Possible failures and corrective actions of the standby power system:
CHAPTER 6 UNINTERRUPTIBLE POWER SUPPLY SYSTEMS
Description of uninterruptible power supply (UPS) system
Operation of uninterruptible power supply system
Commissioning plan for the UPS system
Installation inspections and component testing of the UPS system
Energizing and test of the UPS system
Possible failures and corrective actions
CHAPTER 7 HIGH ALTITUDE ELECTROMAGNETIC PULSE (HEMP) AND HIGH POWER MICROWAVE (HPM) EQUIPMENT & CONTROLS
General HEMP protection systems
HEMP protection systems
Download : pdf1













I would appreciate if can add these topic Photovoltaic Science and Engineering and solar panel technology or thermal electricity. your web site is very help full for my studies . thank you for all the help u have provided people like myself, who can’t afford to buy expensive books I saluate u from bottom of my heart freind.
Kind Regards
Tom
We are in the process of pre commissioning and commissioning our project which has the following systems
A. Electrical systems to be commissioned include the following: [Edit or add to the following scope as appropriate to the Project.]
1. Secondary Service Electrical Systems.
2. Motor Control Centers.
3. Distribution and Branch Circuit Panelboards.
4. Lighting Fixtures and Controls.
5. Lightning Protection Equipment and Lightning Protection Systems.
6. Elevator Systems.
7. Equipment Monitoring.
8. Fire Alarm Equipment/Fire Alarm Equipment Monitoring System.
9. AC Motors.
10. MV cable at 15 KV
11. ring main units
12. transformers 13.8 KV / 380 Volts
13. Cables 1000 volts
14. Grounding Equipment and Building Grounding System.
15. Data system
16. Socket outlets
17. Security System.
Please inform us the tools and meters required to accomplish the task of commissioning the project.
Kindly reply on our e mail mustafakhan55 yaho dtt com
Best regards,
Khan Mustafa
Commissioning manager
thank yooooooooooooooooooooooooooooooooooooooooooooooooooouuuuuuuuuuuuuuuuuuuuuuuuuuu
greetings,
i would like to shift field of expertise from manufacturing industry into oil and gas industry. I am a electrical engineering graduate and would like to apply as E&I Engineer. although I dont have any idea on how does O&G work environment is, I am on my way on learning and very much eager and interested. can you help me on some reading materials or medium that I can use during my learning process. also, I want to learn a lot of things regarding commissioning and pre-commissioning…hope you can help me….a million thanks.
Laurence
God bless you for sharing such material… Thanks a lot!