File : pdf, 613 KB, 102 pages
TOC
CHAPT 1 INTRODUCTION
Purpose
Scope
General system testing requirements
Component testing
System commissioning testing
Cost of Commissioning
Examples of commissioning
CHAPT 2 THE NEED FOR COMMISSIONING
General background
The importance of commissioning
The economics of commissioning
CHAPT 3 THE COMMISSIONING PROCESS
General
Commissioning applicability to project phases
CHAPT 4 HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC) EQUIPMENT AND CONTROLS
Description of HVAC systems
Operation of HVAC systems
General HVAC equipment description and operation
Pre-functional test plan and functional performance test plan for HVAC systems
Possible failures and corrective measures for HVAC systems
CHAPT 5 GENERATORS AND ANCILLARY EQUIPMENT
Description of generator ancillary equipment, diesel fuel, and lube oil systems
Operation of diesel fuel system and lube oil systems
Pre-functional test plan and functional performance test plan for diesel fuel and lube oil systems
CHAPT 6 AIR COMPRESSORS AND PNEUMATIC CONTROL SYSTEMS
Description of compressed air and pneumatic control systems
Operation of compressed air systems
General compressed air equipment description and operation
Pre-functional test plan and functional performance test plan for compressed air systems
Possible failures and corrective measures for compressed air systems
CHAPT 7 FIRE FIGHTING AND SUPPRESSION SYSTEMS
Description of wet pipe sprinkler systems and fire detection systems
Operation of wet pipe sprinkler systems and fire detection systems
General fire fighting and suppression system equipment description and operation
Pre-functional test plan and functional performance test plan for wet pipe sprinkler systems and fire detection systems
Possible failures and corrective measures for wet pipe sprinkler system and fire detection system
CHAPT 8 LIFTING AND MOVING DEVICES SUCH AS CRANES AND ELEVATORS
Description of lifting and moving devices
Operation of lifting and moving devices
Pre-functional test plan and functional performance test plan for lifting and moving devices
Possible failures and corrective measures for lifting and moving devices
CHAPT 9 HIGH ALTITUDE ELECTROMAGNETIC PULSE (HEMP) EQUIPMENT AND CONTROLS
Description of HEMP protection for mechanical systems
Operation of HEMP protection for mechanical systems
Pre-functional test plan and functional performance test plan for HEMP protection of mechanical systems
Possible failures and corrective measures for HEMP protection of mechanical systems
CHAPT 10 WATER AND SEWAGE TREATMENT SYSTEMS
Description of water and sewage treatment systems
Operation of water and sewage treatment systems
General water and sewage treatment equipment description and operation
Pre-functional test plan and functional performance test plan for water and sewage treatment systems
Possible failures and corrective measures for water and sewage treatment systems
Download : pdf1