File : pdf, 226 KB, 67 pages
TOC
CHAPT 1 INTRODUCTION
CHAPT 2 INSPECTOR QUALIFICATIONS, CERTIFICATIONS AND LICENSES
CHAPT 3 INSPECTION AND TEST FREQUENCIES
3-1 BOILERS
3-2 UNFIRED PRESSURE VESSELS
CHAPT 4 BOILER INSPECTIONS
4-1 GUIDANCE
4-2 EXTERNAL INSPECTION OF BOILERS
4-3 INTERNAL INSPECTION OF BOILERS
4-4 BOILERS IN WET OR DRY LAY-UP
CHAPT 5 UNFIRED PRESSURE VESSEL INSPECTIONS
5-1 GUIDANCE
5-2 EXTERNAL INSPECTIONS OF UNFIRED PRESSURE VESSELS
5-3 INTERNAL INSPECTIONS OF UNFIRED PRESSURE VESSELS
5-4 MILITARY SPECIFICATION (MILSPEC) PRESSURE VESSELS
5-4.1 Internal and External Inspections
5-4.2 Ultrasonic Examination
5-4.3 Variations
5-5 DEAERATORS
5-6 LIQUIFIED PETROLEUM GAS (LPG) TANKS
5-6.1 External Inspection
5-6.2 Internal Inspection
5-6.3 Hydrostatic Test
5-6.4 Safety Relief Valves
CHAPT 6 PRESSURE TESTS
6-1 HYDROSTATIC TESTS
6-1.1 Strength Test Pressure
6-1.2 Tightness Test Pressure
6-1.3 Precautions
6-1.4 Possible Deformation
6-1.5 Hold Pressure
6-1.6 Inspection Under Pressure
6-1.7 Permanent Deformation
6-1.8 Gaskets
6-2 PNEUMATIC TESTS
6-3 PRESSURE TEST RESULTS
6-3.1 Yielding During Test
6-3.2 No Yielding During Test
6-3.3 Inspection Under Pressure
CHAPT 7 OPERATIONAL TESTS
7-1 GUIDANCE
7-1.1 Purpose
7-1.2 Conditions to be Reported
7-2 FIRING EQUIPMENT
7-3 CONTROLS
7-4 PIPING AND PIPING CONNECTIONS
7-5 DEVICES
7-5.1 Temperature Indicating Devices
7-5.2 Metering and Recording Devices
7-6 VALVES
7-6.1 Blow-Down Valves
7-6.2 Stop and Check Valves
7-6.3 Pressure Reducing Valves
7-6.4 Safety and Safety Relief Valves
7-7 BOILER AUXILIARIES
7-8 BOILER AND FEEDWATER TREATMENT
7-9 FUEL HANDLING PRACTICES
CHPAT 8 REPAIRS AND ALTERATIONS
8-1 GUIDANCE
8-2 CONTRACTOR REPAIRS
8-2.1 NAVY Welder Qualifications
8-2.2 Repairs by a Navy Welder
8-3 SETTING SAFETY AND RELIEF VALVES
8-4 RECORDS
CHAPT 9 INSPECTION CERTIFICATES AND REPORTS
9-1 PROCEDURES FOR SUBMITTING REPORTS AND FORMS
9-1.1 Inspection Reports – Boilers and Unfired Pressure Vessels
9-1.2 Inspection Certificate for Boilers – Unfired Pressure Vessels
CHAPT 10 MAXIMUM ALLOWABLE WORKING PRESSURE
10-1 GUIDANCE
10-2 STANDARD BOILERS
10-2.1 Standard Watertube Boilers
10-2.2 Standard Cast-Iron Steam Boilers
10-3 NONSTANDARD BOILERS
10-3.1 Nonstandard Riveted Boilers
10-3.2 Nonstandard Welded Boilers
10-3.3 Nonstandard Cast-Iron Boilers
10-4 CALCULATIONS OF MAXIMUM ALLOWABLE WORKING PRESSURE
10-5 FACTOR OF SAFETY
CHAPT 11 MISHAP OR PROPERTY DAMAGE REPORTING
11-1 REPORTING REQUIREMENTS
11-2 INFORMATION COPIES
Download : pdf1











i cant open when clicking
pdf access. pls. cerify.
when clicking pdf,
notice says page not found,
needs verification.thank you
Joemarie,
Thanks for your correction. It works now. Please try again.
thank you very much
your such a very kind person
God Bless
Good evenings, nowadays I am in search of information about the procedure that apply for the certification of boilers of high pressure, I would be grateful for any information that you could facilitate to me.
thank you for book it very usefull thank u very much
[...] 2. HYPERBARIC PRESSURE VESSELS 3. TYPES OF HYPERBARIC PRESSURE VESSELS 4. CLASSES OF HYPERBARIC PRESSURE VESSELS 5. DESIGN CONSIDERATIONS 6. MANUFACTURER’S DESIGN REPORT 7. USER’S DESIGN SPECIFICATION [...]
[...] Threaded Fasteners 5.2.10 Tethering Provisions 5.2.11 Jacks 5.2.12 Transportation Equipment 5.2.13 Pressure Vessels 5.2.13.1 Code-Stamped Vessel Registration 5.2.13.2 Pressure Vessels Used in Transporting [...]
I’ve just tried to download the pdf but the link seems to be broken.
Hello Andy,
thank you for your report. The link is working now.
[...] 4.2.2. Radiography testing for measuring of corrosion and deposit in pipes 4.2.3. NDT inspection of boilers & pressure vessels 4.2.4. NDT inspection of heat exchangers & condensers 4.2.5. NDT inspection of turbines & [...]