File : pdf, 773 KB, 86 pages
TOC
Chapt 1. General
1-1. Purpose And Scope
1-2. Applicability
1-4. Design Objectives
1-5. Special Wastes
1-6. Limitations
1-7. Alternatives To Gravity Systems
Chapt 2. Preliminary Design Considerations
2-1. Existing Conditions
2-2. Field Investigations
2-3. Layout
2-4. Pumping Station Site Selection
2-5. Pumping Station Building And Site Requirements
2-6. Protection Of Water Supplies
Chapt 3. Hydraulic Design Of Sewers
3-1. Quantity Of Wastewater
3-2. Gravity Sewer Design
3-3. Required Pumping Capacity
3-4. Depressed Sewers
3-5. Hydrogen Sulfide In Sewers
Chapt 4. Sewer System Layout And Appurtenances
4-1. Manholes
4-2. Building Connections
4-3. Cleanouts
Chapt 5. Structural Design Of Sewers
5-1. General
5-2. Loads On Sewers
5-3. Supporting Strength Of Sewers
5-4. Special Designs
Chapt 6. Pumping Station And Equipment
Paragraph 6-1 .Type Of Construction
6-2. Pumps
6-3. Pump Drives
6-4. Drive Mechanisms
6-5. Pump Controls And Instrumentation
Chapt 7. Pumping System Design
7-1. Force Main Hydraulics
7-2. Pump Analysis And Selection
7-3. Pump Controls
7-4. Pump Scheduling And Operations
7-5. Wet Well Design
7-6. Cavitation
7-7. Surge Analysis And Control
7-8. Screening And Comminuting Devices
Chapt 8. Piping
8-1. Pipe Material, Fittings, And Joints
8-2. Valves And Appurtenances
8-3. Installation
Chapt 9. Pumping Station Components
9-1. General
9-2. Construction Requirements And Materials
9-3. Structural Systems
9-4. Mechanical Equipment
9-5. Heating And Ventilation
9-6. Electrical Equipment And Lighting
9-7. Standby Powers
9-8. Water Supply
9-9. Flow Measurement
9-10. Painting And Protective Coats
Chapt 10. Evaluation Of Existing Sewer Systems
10-1. Problem
10-2. Sources Of Sewer System Deterioration
10-3. Infiltration/Inflow Analysis
10-4. Smoke Testing
10-5. Physical Inspections
10-6. Remote Inspections
Chapt 11. Rehabilitation Of Existing Systems
11-1. Rehabilitation Versus Replacement
11-2. Grouting
11-3.Cement Lining
11-4. Sliplining
11-5. Cured In Place Piping (Cipp)
11-6. Deformed/Folded Liners
11-7. Pipe Bursting
11-8. Pipe Crushing
11-9. Other Methods
Download : pdf1













[...] Section 2 INDUSTRIAL WASTEWATER COLLECTION AND TREATMENT 2.1 Objectives 2.2 Industrial Pollutants 2.3 Source Control and Waste Reduction 2.4 Wastewater Flows and Characteristics 2.5 Wastewater Collection 2.6 Wastewater Treatment 2.7 Guidelines From Actual Experience [...]