File : pdf, 13 MB, 263 pages
TOC
Chapter 1. Introduction
1. Purpose
2. Scope
3. References
4. Umcs
5. Existing Emcs
Chapter 2. General Considerations
1. Reliability
2. Expandability
3. Benefits
4. Applications
5. Codes And Standards
6. Functional Equivalency
7. Power Line Conditioner
8. Uninterruptible Power System
9. Intercommunications Systems
10. Interface And Future Expansion
11. Console And Accessories
12. Support Equipment
13. Transient Protection Requirements
14. Transient Protection Devices
15. Grounding
16. Shielding
Chapter 3. Central Station And Island Station Hardware
1. Hardware Configuration
2. Central/Island Station Computer
3. Communication Processor
4. Network Interface Adapter
5. Hard Drives
6. Floppy Drives
7. Magnetic Tape Systems
8. Optical Drives
9. Printers
10. Workstations
11. Local Area Network
12. Modems
Chapter 4. Field Equipment Panel Hardware
1. Hardware Configuration
2. Smart Field Panel
3. Remote Terminal Unit
4. Universal Programmable Controller
5. Unitary Controllers
6. I/O Functions
7. Chiller Control Panel
8. Boiler Control Panel
Chapter 5. Instrumentation And Controls
1. Sensing Devices
2. Control Devices
3. Microprocessor-Based Controllers
Chapter 6. Software Descriptions And Requirements
1. General
2. Central Station And Island Station
3. Field Equipment Panel
Chapter 7. Applications Software
1. General Description
2. Scheduled Start/Stop Program
3. Optimum Start/Stop Program
4. Economizer Program
5. Ventilation-Recirculation Program
6. Hot Deck-Cold Deck Temperature Reset Program
7. Reheat Coil Reset Program
8. Boiler Monitoring And Control Program
9. Chiller Selection Program
10. Chilled Water Temperature Reset Program
11. Condenser Water Temperature Reset Program
12. Demand Limiting Program
13. Chiller Demand Limiting Program
14. Day/Night Setback Program
15. Hot Water Oa Reset
16. Lighting Control
17. Unitary Controller Applications Programs
18. Utility Control Functions And Sequences Of Operation
Chapter 8. Direct Digital Control Implementation
1. General
2. Instruments And Inputs
3. Diagrams
4. Tables
5. Symbols And Abbreviations
6. Sequences Of Operation
Chapter 9. Supervisory Control Implementation
1. General
2. Instruments And Inputs
3. Diagrams
4. Tables
5. Symbols And Abbreviations
6. Additional Applications
Chapter 10. Data Transmission Systems
1. Umcs Data Transmission Topologies
2. Fiber Optics
3. Wirelines
4. 10 Base-T
5. Coaxial Cable
6. Radio Frequency (Rf)
7. Packet Radio
8. Government-Furnished Data Transmission Systems
Chapter 11. Equipment Modifications
1. Modification Guidelines
2. Instrumentation And Controls
3. Local Controllers Under Supervisory Control
4. Controller Interfaces
5. Time Clocks
6. Single Loop Digital Controllers
7. Instrument Air Supply
8. Electrical Equipment
9. Substations
10. Switchgear
11. Emergency Generator
12. Motor Starters
13. Mechanical Equipment
14. Chillers
15. Boilers
16. Hvac
17. New Building Preparation
Chapter 12. Project Implementation
1. Sequence Of Events
2. Viability Survey
3. Information Collection For Design
4. Buildings And Systems Selection
5. Design Survey
6. Applications Program Selection
7. Repair And Replacement (Existing Equipment)
8. Identification Of Equipment Modifications
9. I/O Point Selection Estimate
10. System Configuration
11. Data Communication Considerations
12. Intercommunications
13. Field Hardware Location
14. Equipment Modifications
15. Energy Savings
16. Cost Avoidance
17. Cost Savings
18. Cost Estimates
19. Economic Analysis
20. Dd Form 1391 Validation
21. Central Station And Island Stations
22. Instrumentation And Controls
23. Wiring Requirements
24. Transient Protection
25. Drawings
26. Specifications
27. Construction Period
Chapter 13. Expansion And Upgrade Of Existing Emcs
1. Upgrade Guidelines
2. Expansion Guidelines
Download : pdf1















hi dears thanks so mach from useful links
Very nice book for Facility monitoring and control system,
thank you very much.
Thank you very much for excellent book.
this is a very good effort to provide such valuable books without cost,which encourage students to go further
to go further in any subject