File : pdf, 2 MB, 184 pages
TOC
CHAPTER 1 INTRODUCTION, SCOPE AND ORGANIZATION
1.1 PURPOSE OF THE MANUAL
1.2 SCOPE AND INTENT OF MANUAL
1.3 ORGANIZATION
CHAPTER 2 OPERATING OF SHORE-BASED HYPERBARIC FACILITIES
2.1 GUIDANCE DOCUMENTS
2.2 CERTIFICATION REQUIREMENTS
2.3 MATERIAL PROVISIONING AND CONTROL
2.4 USER DOCUMENTATION REQUIREMENTS
2.4.1 Hyperbaric Construction Contract Documentation
2.4.2 Activity Generated Documentation
2.5 MAINTENANCE AND OPERATIONS SCHEDULING
2.5.1 Coordination of Operations with Maintenance Planning
2.6 HAZARD CATEGORIES
2.6.1 General
2.6.2 Hazard Categories
2.6.3 Hazard Category Criteria
2.6.4 Hazcat Guidelines
2.7 REPORTING REQUIREMENTS
2.7.1 SCA Reports
2.8 PERSONNEL TRAINING
2.8.1 Introduction
2.8.2 Personnel Training and Qualifications
2.9 FACILITY PRE-DIVE PLANNING
2.9.1 Pre-Dive Planning Events
2.10 REFERENCE MATERIALS
CHAPTER 3 MAINTENANCE OF HYPERBARIC FACILITIES
3.1 DEFINITION OF TYPES OF MAINTENANCE
3.1.1 Maintenance Types
3.1.2 General Maintenance
3.1.3 Repairs
3.1.4 Alterations
3.1.5 Overhauls
3.2 APPROVAL OF MAINTENANCE ACTIONS
3.2.1 Maintenance Notification Approval Requirements
3.3 GENERAL MAINTENANCE
3.3.1 Introduction .
3.3.2 Scheduled Maintenance:
3.3.3 Unscheduled Maintenance
3.3.4 General Maintenance Concepts
3.4 SCHEDULED MAINTENANCE SYSTEM
3.4.1 Maintenance System Requirements
3.4.2 Maintenance Periodicity
3.4.3 Scheduling and Monitoring Maintenance
3.5 UNSCHEDULEDMAINTENANCE SYSTEM
3.5.1 General
3.5.2 Manned-Operations Failure Management Planning (FMP)
3.5.3 Manned-Operations Failure Management Maintenance (FMM)
3.6 MAINTENANCE DOCUMENTATION REQUIREMENTS
3.6.1 General
3.7 GENERAL MAINTENANCE PRACTICES
3.7.1 Cleaning Practices and Sampling Procedures
3.7.2 Gas Sample Analysis
3.8 EQUIPMENT AND COMPONENT MAINTENANCE PRACTICES
3.8.1 General
3.8.2 Breathing Gas Supply Equipment Maintenance Practices
3.8.3 Piping System Maintenance Practices
3.8.4 Recompression Chamber Maintenance Practices
3.9 MISCELLANEOUS GENERAL MAINTENANCE GUIDANCE
3.9.1 Lubricants and Sealants
3.9.2 Chamber Painting
3.9.3 Piping Color Code and Labeling
CHAPTER 4 CERTIFICATION REQUIREMENTS FOR MAN-RATED HYPERBARIC FACILITIES
4.1 INTRODUCTION AND OVERVIEW
4.2 SYSTEM CERTIFICATION PROCESS
4.3 QUALITY ASSURANCE
4.4 DESIGN AND DRAWING QUALITY CONTROL
4.5 MATERIAL IDENTIFICATION AND CONTROL
4.6 FABRICATION AND IN-PROCESS QUALITY CONTROLS
4.7 TESTING AND INSPECTION QUALITY CONTROL
4.8 FACILITY WORE MANAGEMENT QUALITY CONTROL
4.8.1 General
4.8.2 Re-Entry Control (REC) Procedures and Records
4.8.3 Tag-Out Procedures
4.8.4 Maintenance System and Procedures
4.8.5 Maintenance Records
4.8.6 In-House Quality Control Inspections and Documentation Audits
CHAPTER 5 MATERIAL CONTROL AND PROVISIONING
5.1 MATERIAL PROVISIONING REQUIREMENTS
5.1.1 Stocking Levels
5.2 MATERIAL IDENTIFICATION AND CONTROL
Download : pdf1










