File : pdf, 837 KB, 38 pages
TOC
CHAPTER 1 INTRODUCTION
1-1 SCOPEPURPOSE
1-2 APPLICATION
1-3.1 Facilities Covered
1-3.2 Facilities Not Covered
CHAPTER 2 PLANNING FACILITY INSPECTION
2-1 MAINTENANCE PLANNING
2-2 PLANNING
2-2.1 General
2-2.2 Scope of Work
2-2.3 Existing Data
2-2.3.1 Drawings
2-2.3.2 Calculations
2-2.3.3 Existing Reports
2-3 FIELD INSPECTION / DATA GATHERING
2-3.1 General
2-3.2 Field Inspection
2-3.2.1 Tools Required
2-3.2.1.1 Hand Tools
2-3.2.1.2 Equipment
2-3.2.2 Note Keeping
2-4 ENGINEERING EVALUATION
2-5 TYPE OF MOORING SERVICE
CHAPTER 3 QUALIFICATIONS
3-1 PERSONNEL
CHAPTER 4 INSPECTION FUNDAMENTALS
4-1 LEVELS OF INSPECTION
4-1.1 Level 1 – Walk Through Inspection
4-1.2 Level 2 – Visual Inspection
4-1.3 Level 3 – Detailed Inspection
4-1.4 Fender System
4-2 FREQUENCY OF INSPECTION
4-3 INSPECTION METHODS
4-3.1 Local Conditions
4-3.1.1 Mooring Hardware Fittings
4-3.2 Fasteners
4-3.3 Supporting Structure
4-3.3.1 Concrete
4-3.3.2 Timber
4-3.3.3 Steel
4-3.4 Fender System
4-3.5 Global Conditions
4-3.5.1 Pier Structure
4-3.5.2 Structural Analysis
4-3.5.2.1 Calculations
4-4 PHOTOGRAPHY
CHAPTER 5 REPORT
5-1 REPORT PURPOSE AND OBJECTIVES
5-2 REPORT FORMAT
5-3 REPORT STRUCTURE
5-3.1 Outline
5-3.2 Introduction
5-3.3 Activity Description
5-3.4 Facilities Inspected
5-3.6 Design Structural Capacity
5-3.7 Existing Conditions
5-3.8 Appendices
5-3.8.1 Key Personnel
5-3.8.2 Load Test Procedures
5-3.8.3 Calculations
5-3.8.4 Mooring Hardware Inspection Records
5-3.8.5 Deck Fitting Loads Test Reports
5-3.8.6 References
5-4 3-D MODEL
5-5 DRAWINGS
5-6 DATA TABLES
Download : pdf1













